FOR SALE FACTORY

20 Örnekköy Yolu
Commercial premises • 8000 m² • Split level
QAR 21,843,000
Address of the building: real estate deed, Fatih, Orhangazi District, Fatih District, 5 maps, 465 Island and 78 parcel registration is here. Location: Logistics oriented, the property has a very advantageous place with its proximity to the Gemlik free zone, Yalova and Izmit free zone. The geographical location between Bursa and Istanbul, located between the two industrial cities, is also preferred in the vicinity of Iznik Lake.   Neighbors of the structure: the immovable, the Orhangazi industrial zone, which currently has production facilities known worldwide; Oyak Renault Otomotiv A.Ş., Bamesa Celik Servis A.Ş., Güriş-Doktas Döküm A.Ş., Faurecia Polifleks Otomotiv A.Ş., Ormo Wool Yarn Inc. industrial Zone; Heavy metal castings, automotive sub-industry, wool yarn, steel processing etc. The property area is one of the two areas allowed for the construction of industrial plant in the region.   License information: Land area 9792.61 m2 and completed in the building. A total of 7,945 m2 was added to the license on 20.03.2018 and with construction permits numbered 69. Building design features: All structural steel construction is designed in the future. Maximum ceiling height limit Hmax: 9, 00 m. Assuming that the crane Hook has a high 6.5 or 7m. The two production halls are also ranked on multiple bridged cranes with a capacity of 40 tons. The leakage path of the axle (crane width) is 27, 50 m. There are two production holes with bridge cranes 27, 50 m wide and 126, 00 m long. The floor area of the administrative building adjacent to the production openings is 246 m2, 50 m2 and the total usage area of the three-storey administrative building is 952.70. Current status of the building: in 2018, the current state of the factory construction, the foundations of administrative buildings and production halls and the central design of rainwater (rainwater drainage) and all filled foundation fillings and service routes were completed.  Completion of the structure: will be completed in September 2019.

Spaces

Parking lots (inside)10

Surfaces

Living8000 m²
Land10000 m²
Alarm
Intercom
Internet
Satellite tv

20 Örnekköy Yolu, Topselvi

TypeCommercial
Construction year2017